A pedestrian ramp is the sloped corner where the sidewalk meets the crossing. Corner properties usually need the ramp rebuilt when the sidewalk around it is replaced.
The corner where the sidewalk meets the crossing
- Slope set to current accessibility requirements
- Detectable warning surface laid at the correct position and orientation
- Transition to the roadway finished flush
- Curb line and drainage rebuilt around the ramp
- Permit filed and the finished ramp presented for inspection
Why a ramp is measured apart from the flat walk
Ramps are measured separately from flat sidewalk because the forming, the slope control and the detectable warning panels are all extra work. Corner properties usually need two ramps, not one.
Slope first, concrete second
- Slopes calculated first. Running slope, cross slope and the landing all have limits. They are worked out on paper before anything is dug.
- Existing ramp and curb removed. Ramp and curb come out together because they have to be rebuilt as one piece.
- Formed to the slope. This is precision work. A ramp that is a fraction over on cross slope fails inspection.
- Warning panels set. Detectable warning surfaces set at the right position and orientation, flush with the finished concrete.
Ramp questions from corner properties
Do I need a ramp if my building is on a corner?
What are the bumpy yellow panels?
Is ramp work priced separately?
A ramp can look right and still fail on a measurement
Ramp geometry is inspected against accessibility standards, which are tighter than general sidewalk tolerances. A ramp that looks fine can still fail on a slope measurement.
The full set of NYC sidewalk rules, with links to every City page they come from, is in our violation guide. Last checked .
What gets rebuilt around a ramp
Price my pedestrian ramps
Tell us the address and we will measure it. ADA slope · Detectable warning · Corner properties.
Prefer to talk now? (646) 777-2424
Corner property with a ramp to rebuild?
ADA slope · Detectable warning · Corner properties. We measure on site, put the price in writing, and reply the same business day.